Pro is launching soonDES simulation, ISO PDF export, and advanced workspace. Free analytical tools are fully available now.
ELEVATORDYNAMICSENGINE

Guide / Handling Capacity (HC)

Handling Capacity (HC)

  • KPI
  • Calc

Passengers the group can carry in 5 min, as a percentage of the building population.

Where: Results → Check / KPI dashboard; PDF glossary

Affects

  • Pass/fail vs Table 2 min HC and vs design demand

Defaults & traps

  • HC is % of building population served in 5 minutes.
  • Must clear both the Table 2 minimum and your up-peak demand %.
Open in simulator →

All fields and KPIs · Open the lift traffic simulator